Last Editor:
Anonymous (not verified)
Approved by:
Drew Hemmingson
Job Info
Ordered Date and Time:
19/06/2017 - 16:30
Ordered by:
- miles
Master:
Dave Price
Deck hand:
Gary Neasloss
Vessel:
NEW PRIDE
To:
Unit:
- Tide
Notes:
Spreader bar belonging to van pile was used by frpd barge to offload dozer and they still have it.
Lifting straps left on barge were returned to van pile derrick 6 at anchorage E.
Spill kit is still on tls #18 at our tie up.
Lifting straps left on barge were returned to van pile derrick 6 at anchorage E.
Spill kit is still on tls #18 at our tie up.
Total Job Time:
150
Standby Time:
84
| Signee | Title/Rank | Image |
|---|---|---|
dave price | Tug Crew |
Item codes
Vessel Checklist
Day Shift checklist
Night Shift checklist
Pending:
- Scheduled
Synchronized:
Yes
Device Name:
Tymac iPad 7
Portal Job:
No
Offload Confirmation:
Yes

