Last Editor:
Anonymous (not verified)
Approved by:
Steve
Job Info
Ordered Date and Time:
29/09/2016 - 0:00
Ordered by:
- KENNETH --- SGS SURVEYOR
Master:
Joe Szafranski
Vessel:
MAIPO RIVER
To:
Unit:
- Storm
Notes:
See Paper Slip for Times - DICE Down for Routine Maintenance.
Total Job Time:
32
Standby Time:
20
Item codes
Vessel Checklist
Day Shift checklist
Night Shift checklist
Pending:
- Scheduled
Synchronized:
Yes
